77 F
Cruz Bay
Friday, March 29, 2024
Loading Events

« All Events

  • This event has passed.

Senate: Housing, Public Works, Waste

April 12, 2017 @ 9:00 am

Agenda:

The committee has scheduled a hearing to consider CZM permits for St. Thomas.

RC Hotels Virgin Islands Inc. (CZT-3-16W) – to allow the permittee the continued use and occupancy of an existing 8” diameter X 130’ long seawater intake line to the RO Plant. The line extends seaward of Parcel Nos. 1 and 3 Estate Nazareth, St. Thomas

Sanctuary Holdings LLC (CZT-25-16W) – This permit allows for the installation of eight moorings in two phases. Phase One includes moorings numbered 14 on Exhibit 8; Phase Two includes moorings numbered 5-8 on Exhibit B. this activity is located seaward of Parcel No. 23, Estate Frenchman’s Bay, St. Thomas 

Reef Ecology Foundation (CZT-05-15W) – This permit allows the continued use and occupancy of the permanent moorings for day use only at frequently used dive site locations in the territorial waters surrounding St. Thomas and St. John

Anchorage Condominium Assn. (CZT-10-16W) – This permit allows the continued use and occupancy of a 120’, 3” seawater intake line which services its reverse osmosis plant. In addition, this permit allows for the continued use and occupancy of the submerged lands for six swimming buoys. This activity is located seaward of Parcel No. 8-57-4 Estate Nazareth, St. Thomas.

Dun Run Gold (CZT – I-95LW) — This permit supersedes major Coastal Zone Management Permit No. CZT-1-95 (L&W) and allows for the continued use and occupancy of the existing reverse osmosis plant with 12” diameter, 140’ long intake line and 12” diameter, 650’ long outfall line. The permit site is located at Plot No. C-2-Q Estate Lovenlund, St. Thomas.

St. Thomas Yacht Club (CZT – 4-16 (W)) — This permit supersedes major Coastal Zone Management Permit No. CZT-12-89 (W), and allows for the continued use and occupancy of a 110’-9” x 7’-8” dock with a 39’-6” x 8’-6” … a 335ft. concrete bulkhead with a length of 58 linear feet, 3,500 sq. ft. of submerged land surrounding the dock and one wooden pile. The dock is located seaward of Parcels Nos. 8-1-1 and 8-58 Estate Nazareth, St. Thomas

True Crew VI, LLC (CZT-33-16W) — This permit allows for the installation of a private mooring and the operation of a 37-ft. food boat known as Pizza Ri. This activity will occur at 1818’ 33.464”N / 6449’ 54.955”W in the Christmas Cove area of Jersey Bay, St. Thomas. 

Print Friendly, PDF & Email

Details

Date:
April 12, 2017
Time:
9:00 am
Event Category:

Venue

Earle B. Ottley Legislative Hall, St. Thomas